工程项目应对与化解社会稳定风险的策略研究 ——以“临平净水厂”项目为例

丛杭青1,顾萍2,沈琪3,3,孙国金3,3   

  1. 1. 浙江大学哲学系
    2. 浙江大学
    3.
  • 收稿日期:2018-01-31 修回日期:2018-12-17 出版日期:2019-03-15 发布日期:2019-03-22
  • 通讯作者: 丛杭青
  • 基金资助:

    中国工程实践的伦理形态学研究

Research on strategies to deal with and resolve the risk of social stability in engineering projects ——Take the project of "Linping water purification plant" as an example

  • Received:2018-01-31 Revised:2018-12-17 Online:2019-03-15 Published:2019-03-22

摘要: 社会稳定风险的应对与化解对于工程项目的实施至关重要。论文通过实地调研和文献研究的方法,以“临平净水厂”项目两次选址的过程为例,分析了第一次选址所面临的困境,第二次选址方案的优化细节,以及该方案应对社会稳定风险的策略。这些策略包括组织属地居民考察国内同类工程项目现状、制定环境影响评价公众参与方案、评估项目的社会稳定风险源和风险等级。基于此,论文对社会公众的风险感知进行分析,并对以往的工程社会稳定风险的概念和种类加以修正和重新划分。最后,论文从工程项目的社会维稳设计、利益均衡最大化原则、工程的公众具身参与三个方面,分析与总结了工程项目应对与化解社会稳定风险的策略。

Abstract: The coping and dissolving of the risk of social stability is very important to the implementation of the project. Based on the field investigation and literature research method, taking the process of the two site selection of "Linping water purification plant" project as an example, this paper analyzes the difficulties faced by the first site selection, the details of the second site selection plan, and the strategy to deal with the social stability risk. These strategies include organizing resident residents to inspect the current status of similar projects in China, formulate public participation programs for environmental impact assessment, and assess social stability risk sources and risk levels of projects. Based on this, the paper analyzes the risk perception of the public of the engineering risk, and revises and redivides the concepts and types of the previous engineering social stability risks. Finally, the paper analyzes and summarizes the strategies for engineering projects to deal with and solve social stability risks from the following three aspects: the social stability design of the project, the principle of maximum interest balance and the embodied participation of the public in the project.